Risk Management Plan (Template)
List the risks, assess their severity and probability, and try to consider measures on how the most serious / probable risks could be prevented in advance. In addition, it would be good to have a plan of how to act if the risk materializes. Attach the following section here:
Record the risks to the project in the table below and maintain them as needed. Each risk is given a unique identifier, eg RIS007, as this facilitates their handling in different situations.
RISK ID | Description | Impact |
---|---|---|
#1 | Tiimiläinen menehtyy | S1+ |
#2 | Tiimiläinen sairastuu | S1/S2 |
#3 | Järjestelmät alhaalla | S1 |
#4 | Projekti ei edisty aikataulussa | S2 |
#5 | Työnjako epäselvä | S3 |
#6 | Tietomurtoriski | S1 |
#7 | Budjetti ylittyy | S3 |
#8 | Testausvaiheessa löytyy vakavia virheitä | S1 |
#9 | Puutteellinen dokumentaatio | S3 |
#10 | Tekninen toteutus osoittautuu odotettua monimutkaisemmaksi | S2 |
Severity descriptions
The severity class should be defined according the project
Severity class | Description | Other |
---|---|---|
S1 | Force Major - Total show stopper | |
S2 | ||
S3 | Possible | |
S4 | ||
S5 | No immediate affect, to be observed |